PROJECT SUMMARY
Involves the design and installation of utility infrastructure for ADA-Compliant restrooms located inside Waterfront Park.
> Timeline: 2027-2028
> Costs: $121,000
> Documents/Design: *The below image is a draft design from G&O - Designs have not yet been finalized.*