PROJECT SUMMARY
Involves the design and installation of utility infrastructure for ADA-Compliant restrooms located inside Waterfront Park.

     > Timeline:  2027-2028
     > Costs: $121,000
     > Documents/Design:  *The below image is a draft design from G&O - Designs have not yet been finalized.*