PROJECT SUMMARY:
There are several roads within the Town that require treatments such as crack sealing, pothole repair, and pavement repair to preserve their condition, prevent premature failure and extend their lifespan. This project will focus on crack sealing streets that are potential candidates for future overlays.
> Timeline: 11/2024 - 11/2025
> Costs: $166,000.00
> Funder: Transportation Improvement Board - Small City Maintenance Program
> Documents/Design: