BUTLER STREET RECONSTRUCTION

PROJECT SUMMARY:
The roadway will be rebuilt in its current location. The existing extruded curb on the easterly side of the road will be replaced with curb gutter. The existing curb and walkway on the westerly side of the road will be replaced with curb gutter and accessible sidewalks and driveway entrances. Minor storm drainage improvements will be added to direct runoff to the existing system.

     > Timeline: 11/2024 - 11/2025
     > Costs: $341,387.00
     > Funder: Transportation Improvement Board - Small City Arterial Program
     > Documents/Design: N/A